Challenge
A pipe mill needed cranes for handling steel pipes up to 12 meters long and heavy billets. Special lifting attachments were required to prevent pipe bending during lifts, and the cranes had to work with a continuous production line.
Solution
D2 Cranes designed double girder cranes with special spreader beams to distribute the load of long pipes. Twin hoists were mounted on the same bridge for balanced lifting.
Scope of Work
- 3 double girder cranes (15 and 25 ton capacity)
- Adjustable spreader beams
- Twin hoist system for balanced pipe lifting
- Twin hoist synchronization control
- 120-meter runway installation
- System commissioning and operator training
Result
The spreader beam and twin hoist system enabled safe lifting of long pipes without bending. Production efficiency increased by 25% through reduced handling time.
Related Projects
Steel Mill - Heavy-Duty Double Girder Cranes
Both cranes have operated continuously for over 18 months with zero unplanned downtime. The intelligent control system reduced operational errors and improved maintenance scheduling through predictive diagnostics.
Steel Coil Storage Center - C-Hook Coil Handling Crane
Coil storage and dispatch throughput increased by 50%. The rotating C-hook system reduced coil handling damage to less than 0.1%.
Aluminum Smelter - Ingot Handling Crane System
The cranes operated efficiently across 3 shifts, 24 hours a day. Motor and control panel temperatures remained within normal range despite operating near furnaces exceeding 700 degrees Celsius.