Projects
Crane system installations and case studies across industrial facilities in Thailand
Automotive Assembly Plant - Overhead Crane System
The crane system was delivered on schedule and integrated seamlessly with the plant's production workflow. The client reported improved production cycle times and zero safety incidents in the first year of operation.
Steel Mill - Heavy-Duty Double Girder Cranes
Both cranes have operated continuously for over 18 months with zero unplanned downtime. The intelligent control system reduced operational errors and improved maintenance scheduling through predictive diagnostics.
Logistics Center - Warehouse Crane Installation
The installation gained 1.2 meters of additional usable lifting height compared to standard models. The client achieved faster cargo handling and reduced forklift dependency.
Power Plant - Turbine Hall Crane
The crane completed the turbine installation ahead of schedule and now serves as the primary crane for annual turbine maintenance operations.
Auto Parts Factory - Stamping Line Crane System
Die changeover time was reduced by 40%. The automatic positioning system eliminated die damage from misalignment, achieving zero tooling incidents since installation.
EV Battery Plant - Battery Module Handling Crane
The cranes met Class 10,000 cleanroom standards with zero battery module damage reported during handling in the first 12 months, reducing production line waste by 15%.
Tire Manufacturing Plant - Rubber Roll Handling Crane System
The crane system operated continuously in the high-heat, dusty environment without issues. Rubber roll handling time was reduced by 35% compared to forklift operations.
Steel Coil Storage Center - C-Hook Coil Handling Crane
Coil storage and dispatch throughput increased by 50%. The rotating C-hook system reduced coil handling damage to less than 0.1%.
Aluminum Smelter - Ingot Handling Crane System
The cranes operated efficiently across 3 shifts, 24 hours a day. Motor and control panel temperatures remained within normal range despite operating near furnaces exceeding 700 degrees Celsius.
Pipe Mill - Pipe and Billet Handling Crane
The spreader beam and twin hoist system enabled safe lifting of long pipes without bending. Production efficiency increased by 25% through reduced handling time.
Cold Storage Warehouse - Low-Temperature Resistant Crane
The cranes operated efficiently at -25 degrees Celsius around the clock. Cold storage goods handling time was reduced by 45% compared to forklift operations.
E-Commerce Fulfillment Center - Semi-Automated Crane System
The semi-auto system reduced goods arrangement time by 55% and lowered pallet misplacement errors to less than 0.5%. Peak promotional period volumes were handled smoothly.
Chemical Storage Facility - Explosion-Proof Crane
The cranes were certified to ATEX Zone 2 and relevant TIS standards. They operated safely in the flammable chemical area with zero safety incidents over 2 years of operation.
Solar Farm - Mobile Gantry Crane for Maintenance
Heavy equipment maintenance time was reduced by 60% compared to renting external mobile cranes. The investment was recouped within 8 months.
Gas Turbine Overhaul Facility - Turbine Component Crane
The crane successfully lifted an 85-ton gas turbine rotor with millimeter accuracy. Turbine overhaul time was reduced by 30% with zero component damage from lifting operations.
Hydropower Dam - Spillway Gate Handling Crane
The crane operated efficiently outdoors in both dry and rainy seasons. The anti-corrosion system eliminated the need for repainting within the first 5 years.
Brewery - Fermentation Tank and Production Equipment Crane
The cranes passed food hygiene inspections and operated in high-steam environments without rust. Fermentation tank relocation efficiency during production increased by 40%.
Frozen Food Plant - Raw Material and Finished Goods Crane
The dual-zone cranes operated smoothly across temperature zones without condensation issues. Transfer time between production zones and cold rooms was reduced by 50%.
Sugar Mill - Production Line Equipment Crane
The cranes performed well in the sugar dust and high humidity environment. Crushing roller maintenance time was reduced from 5 days to 2 days, increasing production capacity during the milling season.
Oil Refinery - Distillation Column Maintenance Crane
The crane was ATEX Zone 1 certified and used safely for annual distillation column maintenance. Turnaround time was reduced by 20% compared to renting external cranes.
Polymer Plant - Big Bag and Equipment Handling Crane
The dual hoist system enabled quick switching between big bag handling and maintenance tasks. Production line downtime for maintenance was reduced by 35%.
Precast Concrete Factory - Concrete Panel Handling Crane
The 4-crane system on the same runway operated smoothly without collisions. Precast concrete production capacity increased by 30% through faster piece handling.
Bridge Construction Project - Gantry Crane for Bridge Girders
All 24 bridge girders were placed on schedule with positional accuracy within 5 millimeters tolerance. Zero safety incidents occurred throughout the project.
Semiconductor Factory - Cleanroom Crane System
The cranes met Class 100 cleanroom standards without increasing particle counts. Noise levels stayed below 60 dB, not affecting chip production. New machinery installation time was reduced by 50%.
No results found
Ready to discuss your crane requirements?
Our engineering team is ready to help you find the right lifting solution for your facility. Contact us for consultation or a quote.